The most of the coating specification requires that chloride testing ( Bresle Bresle patch Method) being performed before sandblasting i.e. SSPC-SP 5 White Metal Cleaning, SSPC-SP 10 Near-White Metal Cleaning, etc.  The chlorides are the salts of HCL acid; the CL gets one electron to form anion Cl-. It is substantial to measure the amount of contaminants such as chloride salt before application of sandblasting. 

The sandblasting not only does not remove soluble salt contamination but also cause the contamination of the “sands” that might be used for another job and consequently might contaminate other equipment which is subjected to sandblasting.

If chloride salt remains on the surface can draw moisture through the paint and cause corrosion in metal surface and subsequently cause paint failure. The chloride salt if stays between coating layers similarly absorb moisture through osmotic action and cause disbondment and cause paint failure. 

Measure Chloride Amount by Bresle Patch Chloride Testing

The Bresle Patch Method is most common test method to measure chloride content. This chloride testing is done based on the requirements of the ISO 8502-6 and ISO/DIS 8502-9. Select a test area on the equipment surface and make sure the selected area is dry and there is no loose mill scale or rust.

Follow the Bresle Patch manufacturer instruction and remove the cover and adhere the patch to the selected area.  Fill the syringe with the 5-milliliter solution and inject to the spongy foam of patch, subsequently fill the syringe with 3-milliliter reagent water and inject to the patch. Gently massage the patch and ensure the solution is in contact with the metal surface. The solution should be in contact for almost 15 seconds and then fill back syringe with patch solution and use a Kitagawa tubes to measure chloride amount. The coating specification requires one test being performed on each 100 square ft. 

Permisible Amount of the Chloride

The permissible amount of chloride is different from one specification to another one, and still, there is no particular standard or code to determine the allowable amount. In most cases, the customers require being less than 10μg/cm² or sometimes required by ppm amount.

However, if the test indicated that chloride level is higher than this amount (or specified amount) the surface shall be subjected to solvent cleaning and the test shall be repeated. If after solvent cleaning, chloride content still is higher than the specified value, the surface is subjected to the high-pressure water jetting. Similarly, the test is repeated and if fell below the permissible level, then can be proceeded to the sandblasting process. 

Return to Coating Inspection

Executive Summary & Industrial Inspection Scope

In demanding industrial environments across Oil, Gas, Petrochemical, Offshore, and Heavy Process Infrastructure, rigorous compliance with SSPC-PA 2, NACE SP0188, ISO 8501-1, ASTM D4285 is essential to ensure operational integrity, personnel safety, and compliance with statutory regulatory frameworks. This technical specification provides QA/QC managers, procurement engineers, welding inspectors, and third-party inspection (TPI) agencies with an authoritative, field-tested guideline for “Chloride Testing Bresle Bresle Patch Method”.

Ensuring compliance regarding chloride testing bresle bresle patch method minimizes the risk of catastrophic asset failures, costly unscheduled shutdowns, and supplier non-conformances. The following technical sections delineate the scope of inspection, mandatory verification protocols, acceptance criteria, documentation deliverables, and root cause mitigation strategies.

Governing International Engineering Codes & Specifications

Verification and validation of Chloride Testing Bresle Bresle Patch Method must strictly conform to the latest editions of the following international engineering codes and project specifications:
• **Primary Standard Reference:** SSPC-PA 2, NACE SP0188, ISO 8501-1, ASTM D4285
• **Quality Management & Inspection Systems:** ISO 9001:2015 & ISO/IEC 17020 (Requirements for the operation of various types of bodies performing inspection)
• **Material Compliance & Traceability:** EN 10204 Type 3.1 / 3.2 Inspection Certificates for metallic and non-metallic pressure-retaining components
• **Personnel Qualification:** ASNT SNT-TC-1A / ISO 9712 for NDT personnel, CSWIP 3.1 / AWS CWI for welding inspection, and NACE / AMPP Level 2/3 for coating and corrosion personnel
• **Statutory & Health Safety Directives:** ASME Boiler & Pressure Vessel Code (BPVC), API Standards, OSHA, and regional local authority regulations.

Step-by-Step Quality Control & Inspection Procedure

The execution of quality surveillance for Chloride Testing Bresle Bresle Patch Method is structured across four progressive QA/QC intervention phases:

Stage 1: Pre-Inspection & Engineering Document Review (Review Point – R)

Prior to commencement of any physical activities or manufacturing operations related to Chloride Testing Bresle Bresle Patch Method, the contractor or vendor must submit all technical submittals to the Owner or TPI agency for formal review and approval.

  • Verification of approved Inspection and Test Plan (ITP) identifying all Hold (H), Witness (W), Review (R), and Surveillance (S) intervention points.
  • Cross-examination of Material Test Reports (MTR / Mill Certificates) against standard design specifications (SSPC-PA 2, NACE SP0188, ISO 8501-1, ASTM D4285).
  • Review and approval of specific Procedure Qualification Records (PQR), Welding Procedure Specifications (WPS), or calibration certificates.
  • Verification that all measurement instruments, gauges, and NDT equipment hold valid calibration certificates from ISO/IEC 17025 accredited calibration laboratories (within 6 to 12 months validity).

Stage 2: In-Process Witnessing & Fabrication Control (Witness / Hold Point – W/H)

During the active execution phase, the certified inspector performs physical surveillance to ensure strict adherence to certified drawings, manufacturing procedures, and code tolerances.

  • Verification of material traceability (heat number, heat treatment lot, plate number) transferred accurately onto fabricated components.
  • Dimensional verification and visual inspection using calibrated gauges, micrometer depth dials, or laser alignment systems.
  • Monitoring ambient environmental parameters (relative humidity, dew point, substrate temperature) when applying surface treatments, welding preheat, or pressure testing.
  • Witnessing non-destructive examination (RT, UT, MT, PT, PMI) at specified percentages according to project critical rating and code requirements.

Stage 3: Final Acceptance, Pressure/Performance Testing & Marking (Hold Point – H)

The culminating milestone where the fully assembled or completed item is subjected to definitive acceptance tests in the presence of the Owner’s Third-Party Inspector (TPI).

  • Execution of pressure proof tests (Hydrostatic at 1.3x to 1.5x MAWP or Pneumatic test) with dual calibrated pressure gauges and temperature recorders.
  • Full visual inspection of completed surfaces, welds, protective coatings, and flange contact faces for absence of mechanical damage or code defects.
  • Validation of permanent stamping, low-stress die markings, nameplate data verification, and barcoding in strict conformity with project specs.
  • Clearing all open punch-list items, non-conformance reports (NCRs), and concession requests prior to issuance of the release note.

Stage 4: Packing, Preservation & Inspection Release (Inspection Release Certificate – IRC)

Ensuring the inspected equipment is adequately protected against atmospheric corrosion, mechanical shock, and marine transit degradation.

  • Inspection of rust preventative coatings, desiccant bags, flange face blind protectors, and vapor corrosion inhibitor (VCI) packaging.
  • Verification of heavy-lift sea fastening lugs, center-of-gravity markings, and export crating compliance (ISPM 15 wooden crating).
  • Compilation and signing of the final Inspection Release Certificate (IRC / Shipping Release) and manufacturer data dossier (MDR).

Technical Acceptance Criteria & Tolerances Matrix

All measurements and physical characteristics must comply with the engineering tolerances and acceptance thresholds tabulated below:

Surface & Coating Parameter Governing Standard Acceptance Criteria / Specified Limit Test Instrument / Method QC Intervention
Solvent Cleaning & Degreasing SSPC-SP 1 Complete removal of visible oil, grease, soil, drawing and cutting compounds UV Light Inspection / Solvent Wipe Test Witness (W)
Abrasive Blast Cleanliness Degree SSPC-SP 10 / NACE No. 2 (Near-White) Random staining shall not exceed 5% of each unit area of surface (95% bare clean metal) ISO 8501-1 Pictorial Standards / SSPC-VIS 1 Hold (H)
Surface Profile Depth (Roughness) ASTM D4417 Method C / NACE SP0287 Anchor pattern depth between 50 µm and 85 µm (or per coating spec sheet) Coarse/X-Coarse Replica Tape (Press-O-Film) & Micrometer Hold (H)
Soluble Salt Contamination (Chlorides) ISO 8502-6 & ISO 8502-9 (Bresle Method) Maximum allowable chloride concentration ≤ 20 mg/m² (or ≤ 3 µg/cm² for offshore) Bresle Patch & Calibrated Conductivity Meter Witness (W)
Dry Film Thickness (DFT) Verification SSPC-PA 2 / ISO 2808 80/20 Rule: No spot reading <80% of nominal; average of spots within specified range Calibrated Type 2 Electronic Magnetic Gauge Hold (H)
Coating Adhesion (Cross-Cut / Pull-Off) ASTM D3359 (X-Cut) / ASTM D4541 (Pull-Off) Adhesion rating 4A/5A or minimum tensile pull-off strength ≥ 7.0 MPa (1000 psi) Hydraulic Dolly Pull-Off Adhesion Tester Witness (W)

Mandatory QA/QC Dossier & Inspection Deliverables

Prior to the final issuance of the Inspection Release Certificate (IRC), the contractor and vendor must compile and submit the verified manufacturer data record containing:

  • Approved Inspection & Test Plan (ITP) with sign-off stamps by Contractor, Client, and TPI.
  • Material Test Reports (MTR / Mill Test Certificates EN 10204 Type 3.1 or 3.2).
  • Certified Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR), and Welder Performance Qualifications (WPQ).
  • Calibration Certificates for all test instruments and measuring equipment (NABL / ISO 17025 accredited).
  • Non-Destructive Examination Reports (RT, UT, MT, PT, PMI, Ferrite Content) evaluated by Level II/III inspectors.
  • Heat Treatment & PWHT Time-Temperature Recorder Charts with thermocouple layout drawings.
  • Hydrostatic / Pneumatic Pressure Proof Test Certificate with calibrated chart recorder logs.
  • Surface Preparation and Protective Coating Inspection Reports (Daily environmental log, blast profile, DFT summary).
  • Non-Conformance Report (NCR) and Concession Disposition Closeout Log.
  • Official Inspection Release Certificate (IRC / Shipping Release Note) permitting packing and dispatch.

Common Non-Conformances & Field Mitigation Strategies

Based on extensive third-party inspection field records in oil & gas projects, the following deviations require heightened surveillance:

Defect / Hazard: Material Grade Substitution & Lack of Heat Traceability

Root Cause: Uncontrolled workshop storage, missing color coding, or unverified supplier sub-tier procurement without EN 10204 3.1 documentation.

Preventative Action: Enforce strict 100% Positive Material Identification (PMI) prior to cutting, and mandatory material receiving inspection with physical stamping cross-referenced to original mill test certificates.

Defect / Hazard: Out-of-Tolerance Fit-Up & Alignment Mismatch

Root Cause: Poor thermal cutting, thermal distortion from excessive preheat, or inadequate jigging and tacking arrangements.

Preventative Action: Establish a mandatory Witness/Hold point at joint fit-up before root pass deposition. Use calibrated Hi-Lo gauges to verify bevel angle, root face, and root gap according to the qualified WPS.

Defect / Hazard: Premature Coating Delamination & Blistering Under Film

Root Cause: Excessive soluble salt contamination (>20 mg/m²) left on the substrate, blast cleaning below dew point (<3°C above dew point), or oil/moisture in the blasting compressor air line.

Preventative Action: Perform Blotter Test (ASTM D4285) daily on compressed air, enforce Bresle patch chloride testing, and apply primer within 4 hours of abrasive blasting before rust blooming initiates.

Defect / Hazard: Pressure Drop During Final Hydrostatic Proof Testing

Root Cause: Micro-leakage through temporary test flange gaskets, entrapped air pockets inside vessel high points, or inadequate temperature stabilization.

Preventative Action: Ensure thorough venting at all high-point vents until bubble-free fluid emerges, allow minimum 15-minute temperature stabilization between filling medium and ambient metal, and torque all blind flanges with calibrated torque wrenches.

Frequently Asked Questions (FAQ)

Q: What are the mandatory qualifications for inspectors verifying Chloride Testing Bresle Bresle Patch Method?

A: Inspectors must hold recognized international certifications applicable to the discipline. For welding and fabrication: CSWIP 3.1/3.2, AWS CWI, or API 510/570 Source Inspector. For NDT: ISO 9712 or ASNT SNT-TC-1A Level II minimum. For coatings: NACE / AMPP Level 2 or FROSIO Level III. Additionally, the inspection agency must operate under an ISO/IEC 17020 accredited quality management system.

Q: How does PtroTek resolve non-conformances (NCRs) encountered during vendor surveillance?

A: When a deviation from certified drawings or SSPC-PA 2, NACE SP0188, ISO 8501-1, ASTM D4285 is detected, the inspector issues a formal Non-Conformance Report (NCR) within 24 hours. The vendor must submit a Root Cause Analysis (RCA) and proposed disposition (Rework, Repair, or Concession). Work on the affected component is halted (Hold Point) until the Owner’s engineering authority approves the disposition and a re-inspection confirms full compliance.

Q: What is the difference between Witness (W) and Hold (H) points in an Inspection & Test Plan (ITP)?

A: A Hold Point (H) is a mandatory milestone where fabrication or testing CANNOT proceed without the physical presence of the designated client or third-party inspector. Written clearance or stamping is strictly required. A Witness Point (W) requires prior notification (typically 24 to 48 hours) to the inspector; however, if the inspector fails to attend at the scheduled time, fabrication or testing may proceed with subsequent review of the test records.

Q: Can international clients review inspection reports and photos in real time?

A: Yes. PtroTek provides comprehensive Flash Reports issued within 24 hours of inspection completion, followed by detailed formal inspection reports accompanied by high-resolution calibrated photographic evidence, dimension logs, and signed vendor test records for complete global transparency.

Need Certified Third-Party Inspection (TPI) Support?

PtroTek provides international vendor surveillance, ASME code vessel inspection, welding QA/QC, and protective coating verification across Southeast Asia, the Middle East, and global fabrication hubs.

Request a Technical Inspection Quote