The ASME Code Section 8 is the construction code for pressure vessel and covers design, manufacturing and pressure vessel inspection and testing in the manufacturing shop.
This Code section addresses the mandatory requirements, specific prohibitions, and non-mandatory guidance for Pressure Vessel Materials, design, fabrication, examination, inspection, testing, certification, and pressure relief.
In this article you will learn about the different subsections and guidelines for the use and application of this code.
For ASME Code Section 8 scope and boundaries, review the Pressure Vessel Definition article.

You may know ASME Code Section 8 has three divisions. Division 1 covers pressure up to 3000 psi, Division 2 has an alternative rule and covers up to 10,000 psi and Division 3 can be used for pressure higher than 10,000 psi.
Hierarchy of Standard
1. Law and Regulation at Location of Installation
Mandatory application of ASME pressure vessel code is determined by rule and regulation at location of installation.
For example, if you are living in the state of Minnesota, the application of ASME Code for construction and stamping is mandatory in your location, but if you are living in the state of South Carolina, it is not mandatory.
2. ASME Boiler and Pressure Vessel Code
The next item in this hierarchy is ASME Code itself; the ASME Code generally is divided into three groups as following:
Group 1: Construction Codes
Some of them are: Section VIII for pressure vessel, Section I for Power Boiler, section III for Nuclear Power Plant and Section IV for heating Boiler
Group 2: Reference Codes
These are the codes which are referenced from construction codes as explained in group 1.
The ASME Section IX for welding and Section V for Non Destructive Testing are in this Group.
For example, ASME Code section VIII for welding requirement such as WPS (Welding Procedure Specification), PQR (Procedure Qualification Record), Welder Performance Qualification, etc. refer you to ASME Section IX.
Group 3: In-Service Codes
These are the codes for in-service inspection after placing the equipment into service.
The ASME Section VI for the heating boiler and Section VII are from this group.
3. National Board Inspection Code(NBIC):
We have assigned a separate article for the NBIC, but as required for this article, the NBIC is making certification for ASME Authorized Inspectors and is also certifying R stamp for Repair services for stamped pressure vessels.
ASME Code Section 8 Content:
See following Fig; it shows ASME Code Section 8 Content:

This section is divided into three Subsections, Mandatory Appendices, and Nonmandatory Appendices.
Subsection A consists of Part UG, covering the general requirements applicable to all pressure vessels.
Subsection B covers specific requirements that are applicable to the various methods used in the fabrication of pressure vessels.
It consists of Parts UW, UF, and UB dealing with welded, forged, and brazed methods, respectively.
Subsection C covers specific requirements applicable to the several classes of materials used in pressure vessel construction.
It consists of Parts UCS, UNF, UHA, UCI, UCL, UCD, UHT, ULW, and ULT dealing with carbon and low alloy steels, nonferrous metals, high alloy steels, cast iron, clad and lined material, cast ductile iron, ferritic steels with properties enhanced by heat treatment, layered construction, and low temperature materials, respectively.
For example, if you need to manufacture a pressure vessel with SA 516 Gr.70 material (Carbon Steel), then you need to meet the marked items in above Fig.
Please note that ASME Code Section 8, does not provide you fabrication tolerances except for misalignment and weld reinforcement.
For example, for nozzle orientation, projection, elevation and other required tolerances there are no values in the code, and you may refer to pressure vessel handbooks for such information.
Review the Pressure Vessel Dimension Inspection article for such tolerances.
If you review the ASME Forward statement it clearly says “The Code does not address all aspects of construction activities, and those aspects which are not specifically addressed should not be considered prohibited.”
In continuing it says, “The Code is not a handbook and cannot replace education, experience, and the use of engineering judgments.”
For example, ASME Code Section 8 Div 1 in UG-28 mandates all loading to be considered in pressure vessel design, but the method for calculation of all of them has not been addressed.
For example, the formula for wind or earthquakes is not provided in the ASME Code Section 8, and these items and other similar loading considerations need to be designed by using the information provided in the pressure vessel handbooks.
For ASME pressure vessel manufacture certification, as well as Authorized Inspection Agency certification, Review the Pressure Vessel Certification article.
What is the Summary of Important Points in ASME Code Section 8 ?
1. ASME Code Section 8 edition is issued once every 3 years and addenda, once a year – both on July 1st. Edition and addenda become effective on the 1st of January of next year (i.e., 6 months after issue).
2. Thickness of cylindrical shell t = PR/(SE-0.6P) + C
3. Longitudinal weld is more critical because it is subjected to double the stress than Circ. Weld.
4. “Weld joint categories” A, B, C, D – are based on joint locations in the vessel and stress levels encountered. “Weld Types” (type 1, 2, 3, etc.) describe the weld itself.
5. Depths of 2:1 Ellip. and hemisph. heads are D/4 and D/2 respectively. (D= Head diameter.)
6. Weld Joint categories:
Category A:
– All longitudinal welds in shell and nozzles.
– All welds in heads, Hemisph-head to shell weld joint
Category B:
– All circumferential welds in shell and nozzles
– Head to shell joint (other than Hemisph.)
Category C and D are flange welds and nozzle attachment welds respectively.
7. Weld Types:
Type 1: Full penetration welds (Typically Double welded)
Type 2: Welds with backing strip
Type 3: Single welded partial penetration welds
Type 4, 5 and 6: Various Lap welds (rarely used)
8. For full penetration welds (type 1):
Joint efficiency, E = 100%, 85%, 70%
(For the radiography = Full, Spot, Nil respectively)
9. Radiography marking on name plates (typically for Type-1 welds)
RT-1: (E=1) All butt welds – full length radiography
RT-2: (E=1.0) All Cat. A Butt welds Full length, Cat B, spot
RT-3: (E=0.85) Spot radiography of both Cat A and B welds
RT-4: (E=0.7) Partial/No radiography
10. For Welded Heads for E=1, all welds within the head require full length radiography (since they are all Cat. A welds)
11. For seamless heads, E=1, If a) head to shell weld is fully radiographed (if Cat. A), and at least spot radiographed (if Cat. B)
12. Compared to Cylindrical shell, thickness of 2:1 Ellipsoidal head is approx. same as shell, Hemisph. head approx. half and Torisph head is 77% higher.
13. MAWP is calculated for: Working condition (Hot & Corroded). Vessel MAWP is always taken at the Top of the Vessel and is lowest of all part MAWPs adjusted for static pressure.
14. Hydro-Test is Standard Pressure test on Completed Vessels.
Hyd. Test Pr. = 1.3 x MAWP x stress ratio
Insp. Pressure (hydro) = test pr. / 1.3
Min. Test temp. = MDMT + 30°F
Max. Inspection temp. = 120°F
15. Pneumatic test is performed if hydro is not possible due to design or process reasons. Prior to the test, NDT as per UW-50 is mandatory.
Pneumatic test pressure = 1.1 x MAWP x stress ratio, Pressure should be increased in steps (Total 6).
1st step – 50% of test pressure
2nd to 6 step – 10% of test pressure
Insp. Pr. (pneumatic) = test pressure /1.1
16. Pressure gauge range should be about twice the test pressure. However, in any case it shall not be lower than 1.5 times and not higher than 4 times the test pressure.
17. Vessel MAWP represents the maximum safe pressure holding capacity of the vessel. Vessel MAWP is measured at top-most point and is lowest of vessel part MAWPs, adjusted for hydrostatic head.
18. For vertical vessels, hydrostatic pressure caused due to liquid with specific gravity = 1, 1ft of height = 0.43 psig. Or 1 mtr of height = 0.1 Bar
19. Total pressure at any point of Vertical vessel is given by:
Total Pr. = Vessel MAWP + h x 0.433.
(h = height from top in ft.)
20. If part MAWP and elevations are known, Vessel MAWP can be calculated by the deducting hydrostatic head from part MAWP.
21. Ext. Pressure is worked out on basis of Geometric factor A (which depends on L/Do and Do/t ratios) and factor B (depends on A, )
Allowable Ext. Pressure, Pa = 4B/(3(Do/t))
22. For values of A falling to the left of material line in the material chart:
Pa = 2AE/(3(Do/t))
23. Name plate shows The Code stamping, MAWP, design temp., MDMT, and Extent of Radiography.
24. ASME materials (SA) shall be used for code stamped vessel fabrication instead of ASTM (A) materials.
25. Reinforcement pad is not required, if the size of finished opening is (UG 36)
Not exceeding 2-3/8” for all thicknesses of vessel
Not exceeding 3-½”, if vessel thickness is ≤ 3/8’’
26. Reinforcement pad with OD = 2d and thk = vessel thk is always safe (d = diameter of finished opening)
27. Reinforcement limit along vessel wall = 2d
28. Reinforcement limit normal to vessel wall = smaller of 2.5 t or 2.5 tn
29. In reinforcement pad calculations, credit can be taken for area available in shell and nozzle.
30. Fillet weld throat dimension = 0.707 x leg of weld
31. Adequacy of weld sizes shall be checked as required by UW-16. The nozzles construction shall be one of the Code acceptable types.
32. The maximum permitted ovality tolerance (D max – D min) shall not exceed 1% of nominal diameter of vessel. If there is opening, then the tolerance can be increased by 2% x d (d = diameter of opening) if measurement is taken within a distance of ‘d’ from axis of opening.
33. The mismatch tolerances and the maximum allowable weld reinforcement is more strict on longitudinal welds compared to circumferential welds (UW-35).
34. Principle of reinforcement:
Area removed = Area compensated.
Compensation area shall be within reinforcement limits.
35. For use as pressure parts, the plates shall be fully identified. Maximum permitted under tolerance on plates is 0.01” (0.3 mm) or 6% of ordered thickness, whichever is less.
36. All welding (including tack, seal, etc.) shall be done using qualified procedures and welders.
37. Mandatory full radiography in ASME Code Section 8 is required for all welding with thickness exceeding Table UCS-57, and also for lethal service vessels and unfired boilers with Design Pr. More than 50 psig.
38. PWHT is ASME Code Section 8 requirement if thickness exceeds those given in tables UCS-56 (given in notes under the tables). These tables also give min. PWHT temperature and min. holding time (soaking period) based on P-Nos. and thickness respectively.
39. For Furnace PWHT in ASME Code Section 8 , Loading Temperature shall not exceed 800°F, heating rate 400 deg F/hr/inch of thickness, cooling rate 500°F /hr/inch of thickness. Still air cooling permitted below 800°F. During soaking period, temp difference between hottest and coldest part shall not exceed 150°F.
40. Minimum overlap for PWHT in multiple heats = 5 ft.
41. For the ASME Code Section 8 impact test requirement, UCS 66 curve. If MDMT-thickness combination falls on or above the curve, impact testing is exempted. Additional exemptions are given as per UG-20(f) and UCS=68 (c).
Executive Summary & Industrial Inspection Scope
In demanding industrial environments across Oil, Gas, Petrochemical, Offshore, and Heavy Process Infrastructure, rigorous compliance with ASME BPVC Section VIII Div 1 & 2, Section IX, Section V is essential to ensure operational integrity, personnel safety, and compliance with statutory regulatory frameworks. This technical specification provides QA/QC managers, procurement engineers, welding inspectors, and third-party inspection (TPI) agencies with an authoritative, field-tested guideline for “ASME Code Section 8”.
Ensuring compliance regarding asme code section 8 minimizes the risk of catastrophic asset failures, costly unscheduled shutdowns, and supplier non-conformances. The following technical sections delineate the scope of inspection, mandatory verification protocols, acceptance criteria, documentation deliverables, and root cause mitigation strategies.
Governing International Engineering Codes & Specifications
Verification and validation of ASME Code Section 8 must strictly conform to the latest editions of the following international engineering codes and project specifications:
• **Primary Standard Reference:** ASME BPVC Section VIII Div 1 & 2, Section IX, Section V
• **Quality Management & Inspection Systems:** ISO 9001:2015 & ISO/IEC 17020 (Requirements for the operation of various types of bodies performing inspection)
• **Material Compliance & Traceability:** EN 10204 Type 3.1 / 3.2 Inspection Certificates for metallic and non-metallic pressure-retaining components
• **Personnel Qualification:** ASNT SNT-TC-1A / ISO 9712 for NDT personnel, CSWIP 3.1 / AWS CWI for welding inspection, and NACE / AMPP Level 2/3 for coating and corrosion personnel
• **Statutory & Health Safety Directives:** ASME Boiler & Pressure Vessel Code (BPVC), API Standards, OSHA, and regional local authority regulations.
Step-by-Step Quality Control & Inspection Procedure
The execution of quality surveillance for ASME Code Section 8 is structured across four progressive QA/QC intervention phases:
Stage 1: Pre-Inspection & Engineering Document Review (Review Point – R)
Prior to commencement of any physical activities or manufacturing operations related to ASME Code Section 8, the contractor or vendor must submit all technical submittals to the Owner or TPI agency for formal review and approval.
- Verification of approved Inspection and Test Plan (ITP) identifying all Hold (H), Witness (W), Review (R), and Surveillance (S) intervention points.
- Cross-examination of Material Test Reports (MTR / Mill Certificates) against standard design specifications (ASME BPVC Section VIII Div 1 & 2, Section IX, Section V).
- Review and approval of specific Procedure Qualification Records (PQR), Welding Procedure Specifications (WPS), or calibration certificates.
- Verification that all measurement instruments, gauges, and NDT equipment hold valid calibration certificates from ISO/IEC 17025 accredited calibration laboratories (within 6 to 12 months validity).
Stage 2: In-Process Witnessing & Fabrication Control (Witness / Hold Point – W/H)
During the active execution phase, the certified inspector performs physical surveillance to ensure strict adherence to certified drawings, manufacturing procedures, and code tolerances.
- Verification of material traceability (heat number, heat treatment lot, plate number) transferred accurately onto fabricated components.
- Dimensional verification and visual inspection using calibrated gauges, micrometer depth dials, or laser alignment systems.
- Monitoring ambient environmental parameters (relative humidity, dew point, substrate temperature) when applying surface treatments, welding preheat, or pressure testing.
- Witnessing non-destructive examination (RT, UT, MT, PT, PMI) at specified percentages according to project critical rating and code requirements.
Stage 3: Final Acceptance, Pressure/Performance Testing & Marking (Hold Point – H)
The culminating milestone where the fully assembled or completed item is subjected to definitive acceptance tests in the presence of the Owner’s Third-Party Inspector (TPI).
- Execution of pressure proof tests (Hydrostatic at 1.3x to 1.5x MAWP or Pneumatic test) with dual calibrated pressure gauges and temperature recorders.
- Full visual inspection of completed surfaces, welds, protective coatings, and flange contact faces for absence of mechanical damage or code defects.
- Validation of permanent stamping, low-stress die markings, nameplate data verification, and barcoding in strict conformity with project specs.
- Clearing all open punch-list items, non-conformance reports (NCRs), and concession requests prior to issuance of the release note.
Stage 4: Packing, Preservation & Inspection Release (Inspection Release Certificate – IRC)
Ensuring the inspected equipment is adequately protected against atmospheric corrosion, mechanical shock, and marine transit degradation.
- Inspection of rust preventative coatings, desiccant bags, flange face blind protectors, and vapor corrosion inhibitor (VCI) packaging.
- Verification of heavy-lift sea fastening lugs, center-of-gravity markings, and export crating compliance (ISPM 15 wooden crating).
- Compilation and signing of the final Inspection Release Certificate (IRC / Shipping Release) and manufacturer data dossier (MDR).
Technical Acceptance Criteria & Tolerances Matrix
All measurements and physical characteristics must comply with the engineering tolerances and acceptance thresholds tabulated below:
| Pressure Vessel QC Parameter | ASME Code Section | Permissible Tolerance & Acceptance Criteria | Verification Method | QC Level |
|---|---|---|---|---|
| Shell Plate Forming Out-of-Roundness | ASME Sec VIII Div 1 UG-80 | Max difference between max and min inside diameter (Dmax – Dmin) ≤ 1.0% of nominal ID | Internal Trammel Gauge / Laser Sweep Alignment | Witness (W) |
| Head Forming Profile & Peaking | ASME Sec VIII Div 1 UG-81 | Formed torispherical / 2:1 ellipsoidal head profile shall not deviate by more than +1.25% / -0.625% | Radial Profile Wooden Template / Contour Gauge | Witness (W) |
| Weld Seam Alignment Offset (Mismatch) | ASME Sec VIII Div 1 UW-33 | Longitudinal seams offset ≤ 1.6mm (for t ≤ 13mm); Circumferential joints per UW-33 table | Bridge Cam / Hi-Lo Welding Gauge | Hold (H) |
| Full / Spot Radiographic Examination (RT) | ASME Sec VIII Div 1 UW-51 / UW-52 | Full RT: zero cracks, lack of fusion/penetration; Spot RT: per UW-52 evaluation rules | Gamma Ray (Ir-192) / X-Ray with Densitometer and Film Viewer | Hold (H) |
| Hydrostatic Test Pressure & Hold Time | ASME Sec VIII Div 1 UG-99(b) | Pt = 1.3 × MAWP × (S_test / S_design); Min 30 min hold; zero drop on calibrated digital gauge | Certified Dual Pressure Gauges + Calibrated Temperature Recorder | Hold (H) |
| Nameplate Stamping & Manufacturer Data (U-1A) | ASME Sec VIII Div 1 UG-115 to UG-120 | ASME “U” or “U2” stamp, National Board number, serial number, and authorized inspector signature | Visual review and Authorized Inspector (AI) sign-off | Hold (H) |
Mandatory QA/QC Dossier & Inspection Deliverables
Prior to the final issuance of the Inspection Release Certificate (IRC), the contractor and vendor must compile and submit the verified manufacturer data record containing:
- Approved Inspection & Test Plan (ITP) with sign-off stamps by Contractor, Client, and TPI.
- Material Test Reports (MTR / Mill Test Certificates EN 10204 Type 3.1 or 3.2).
- Certified Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR), and Welder Performance Qualifications (WPQ).
- Calibration Certificates for all test instruments and measuring equipment (NABL / ISO 17025 accredited).
- Non-Destructive Examination Reports (RT, UT, MT, PT, PMI, Ferrite Content) evaluated by Level II/III inspectors.
- Heat Treatment & PWHT Time-Temperature Recorder Charts with thermocouple layout drawings.
- Hydrostatic / Pneumatic Pressure Proof Test Certificate with calibrated chart recorder logs.
- Surface Preparation and Protective Coating Inspection Reports (Daily environmental log, blast profile, DFT summary).
- Non-Conformance Report (NCR) and Concession Disposition Closeout Log.
- Official Inspection Release Certificate (IRC / Shipping Release Note) permitting packing and dispatch.
Common Non-Conformances & Field Mitigation Strategies
Based on extensive third-party inspection field records in oil & gas projects, the following deviations require heightened surveillance:
Defect / Hazard: Material Grade Substitution & Lack of Heat Traceability
Root Cause: Uncontrolled workshop storage, missing color coding, or unverified supplier sub-tier procurement without EN 10204 3.1 documentation.
Preventative Action: Enforce strict 100% Positive Material Identification (PMI) prior to cutting, and mandatory material receiving inspection with physical stamping cross-referenced to original mill test certificates.
Defect / Hazard: Out-of-Tolerance Fit-Up & Alignment Mismatch
Root Cause: Poor thermal cutting, thermal distortion from excessive preheat, or inadequate jigging and tacking arrangements.
Preventative Action: Establish a mandatory Witness/Hold point at joint fit-up before root pass deposition. Use calibrated Hi-Lo gauges to verify bevel angle, root face, and root gap according to the qualified WPS.
Defect / Hazard: Premature Coating Delamination & Blistering Under Film
Root Cause: Excessive soluble salt contamination (>20 mg/m²) left on the substrate, blast cleaning below dew point (<3°C above dew point), or oil/moisture in the blasting compressor air line.
Preventative Action: Perform Blotter Test (ASTM D4285) daily on compressed air, enforce Bresle patch chloride testing, and apply primer within 4 hours of abrasive blasting before rust blooming initiates.
Defect / Hazard: Pressure Drop During Final Hydrostatic Proof Testing
Root Cause: Micro-leakage through temporary test flange gaskets, entrapped air pockets inside vessel high points, or inadequate temperature stabilization.
Preventative Action: Ensure thorough venting at all high-point vents until bubble-free fluid emerges, allow minimum 15-minute temperature stabilization between filling medium and ambient metal, and torque all blind flanges with calibrated torque wrenches.
Frequently Asked Questions (FAQ)
Q: What are the mandatory qualifications for inspectors verifying ASME Code Section 8?
A: Inspectors must hold recognized international certifications applicable to the discipline. For welding and fabrication: CSWIP 3.1/3.2, AWS CWI, or API 510/570 Source Inspector. For NDT: ISO 9712 or ASNT SNT-TC-1A Level II minimum. For coatings: NACE / AMPP Level 2 or FROSIO Level III. Additionally, the inspection agency must operate under an ISO/IEC 17020 accredited quality management system.
Q: How does PtroTek resolve non-conformances (NCRs) encountered during vendor surveillance?
A: When a deviation from certified drawings or ASME BPVC Section VIII Div 1 & 2, Section IX, Section V is detected, the inspector issues a formal Non-Conformance Report (NCR) within 24 hours. The vendor must submit a Root Cause Analysis (RCA) and proposed disposition (Rework, Repair, or Concession). Work on the affected component is halted (Hold Point) until the Owner’s engineering authority approves the disposition and a re-inspection confirms full compliance.
Q: What is the difference between Witness (W) and Hold (H) points in an Inspection & Test Plan (ITP)?
A: A Hold Point (H) is a mandatory milestone where fabrication or testing CANNOT proceed without the physical presence of the designated client or third-party inspector. Written clearance or stamping is strictly required. A Witness Point (W) requires prior notification (typically 24 to 48 hours) to the inspector; however, if the inspector fails to attend at the scheduled time, fabrication or testing may proceed with subsequent review of the test records.
Q: Can international clients review inspection reports and photos in real time?
A: Yes. PtroTek provides comprehensive Flash Reports issued within 24 hours of inspection completion, followed by detailed formal inspection reports accompanied by high-resolution calibrated photographic evidence, dimension logs, and signed vendor test records for complete global transparency.